+998 787 777 787


Projects

Projects

Новая зарядная станция на 80 кВт, установленная на паркинге ГИДРОМЕТЦЕНТРА

With the support of the Center for Hydrometeorological Service of the Republic of Uzbekistan (UZHYDROMET), we develop "green" technologies and take care of preserving our ecology.

The new 80 kW charging station installed in the HYDROMETCENTER parking lot is equipped with two high-speed connectors (GB / T and CCS) for Chinese and European electric cars to make the life of electric vehicles even more comfortable.

Установлена на паркинге сети кафе быстрого питания FEED UP

TOK BOR Triple AC Station, equipped with three Type 1, Type 2 and GBT AC connectors capable of charging any electric car in the world, be it American, European or Chinese!

Installed in the parking lot of the FEED UP fast food cafe chain in Sergeli district  (Mirza Tursunzade Street).

Meet the first fast charging station from TOK BOR in Yunusabad district

Meet the first fast charging station from TOK BOR in Yunusabad district!

The new 80 kW terminal installed in the parking lot of the “Besh Qozon” Plov Center has 2 high-speed connectors: CCS Combo 2 for European and GB/T for Chinese electric cars.

If you want to order a fast charging station for your location, call right now at 78 777 7787, and we will be happy to help you!

TOK BOR: fast charging of electric cars in the most convenient locations in Tashkent!

In the parking lot of the FEED UP cafe chain near the city hospital #1, an alternating current station TOK BOR was launched on Kukcha.

In the parking lot of the FEED UP cafe chain near the city hospital #1, an alternating current station TOK BOR was launched on Kukcha.

The terminal is equipped with one GB/T AC connector for Chinese electric cars.

You can check if the charging station is free in the TOK BOR mobile application.

Enjoy the quality charging!

Another fast 120 kW DC-station from TOK BOR started working at the ECOBOZOR parking lot in BERUNI

Another fast 120 kW DC-station from TOK BOR started working at the ECOBOZOR parking lot in BERUNI.

It is equipped with two DC connectors for Chinese electric cars, distributing the station's guaranteed power to 40 and 80 kW.

Thus, charging takes from 15 minutes to 50 minutes - depending on the model of the electric vehicle and the level of remaining charge.

Happy and fast charging to all!

We installed another station on the parking of the Ankhor Lokomotiv park!

We installed another station on the parking of the Ankhor Lokomotiv park!

This time fast- at 160 kW

At the new station, 2 Chinese electric cars with a connector (GB / T) can be charged at the same time, receiving a guaranteed power of 100 or 60 kW!

Charge not just FAST, but also with PLEASURE!

Is there enough charge for the return trip?

Is there enough charge for the return trip? This question is asked by every electric car driver before a trip to the mountains.
By installing a fast electric vehicle charging station TOK BOR on the BOCHKA, this issue is removed overnight!

Excellent location: mountain complex "Chinorkent" with a cable car and two restaurants
Power per 60 kW
Connectors for Chinese and European models

TOK BOR: with care for your comfort and quality of rest.

Now rest in Chimgan is not a headache for electric drivers, but a pleasant tradition!

Now rest in Chimgan is not a headache for electric drivers, but a pleasant tradition!

In the parking lot of the mountain resort LAYNER, whose representatives have taken care of their guests, there is a new public charging station equipped with two sockets for Chinese and European electric vehicles with a charging power of 60 kW.

Enjoy your car charging and have a great rest in the best resort complexes of Chimgan!

We are increasing the power

We are increasing the power!

In order to speed up the electric vehicles charging at TATA location, which is very popular among electric vehicles, we decided to equip it with a more powerful 80 kW station!

TOK BOR fast station is working from today!

We remind you that both Chinese and European electric vehicles can be charged here!

We present to your attention our new project

We present to your attention our new project, implemented jointly with the Energy Oil Group filling station, at Sarakulka.
This is the first filling station whose representatives, at the design and construction stage, immediately took into account all the necessary requirements for placing an electric vehicles charging station.

Here we have installed as many as 2 fast charging stations for Chinese and European electric cars.
Power of each station: 80 kW
Connectors: GB/T DC CCS COMBO 2
Charge your electric vehicles at SEG TASCO filling stations!