
Projects


There are new charging stations are located in the parking lot of the four-star Courtyard by Marriott Tashkent hotel, today.
Here, at two 120 kW stations, 4 Chinese electric vehicles can be charged at the same time.
While the electric car is charging, you can have a good time on the terrace with a bar, as well as visit the restaurant, indoor pool and fitness center.
New location is already in the TOKBOR mobile app




We also installed a TOK BOR 120 kW charging station in the parking lot of the Wave Plaza shopping center now, it located at: Yunus-abad, 18 apt.
There are Milliy taomlar, a fitness club, an internet cafe, billiards, a car service and a car wash are located on the territory of the Wave Plaza shopping center.
Charge in TOK BOR, spend time with pleasure


We are in the city of Gazli, at an equally important location in order to get to the Khorezm region and the Republic of Karakalpakstan!
A powerful 160 kW charging station for Chinese electric vehicles is installed here at the Nozimbar cafe
In this place you can have a tasty snack while the electric car is charging and getting ready for the next trip.
Drive an electric car through the Kyzylkum desert with TOK BOR

The 555-kilometer highway between Bukhara and Nukus through the Kyzyl Kum desert, which is unapproachable for almost any electric car, is now equipped with a TOK BOR electric refueling
We are glad to inform you that today we have installed a 160 kW charging station for Chinese electric vehicles at the most long-awaited location, near the village of Sarimay at the Sarimoy choyhonasi parking lot!
This is a big win for us! We did a great job of finding a location, and then building up electrical capacities in order to equip the location with a powerful electric charging station. After all, our main goal is the free movement of electric car owners along our country
Now any electric vehicle can cross the Kyzylkum desert and reach the Khorezm region and the Republic of Karakalpakstan