+998 787 777 787


Projects

Projects

Our city is developing, striking with the scale of new projects.

Our city is developing, striking with the scale of new projects.
Recently, a huge trade and production complex TASHKENT INDEX has appeared on the map of the capital, where premises for production, shops, catering points, offices and services are located. Of course, such a modern public space could not do without TOK BOR charging stations.
Starting today, an 80 kW fast charger equipped with connectors for Chinese and European electric cars has been launched in the parking lot of the complex.

Look for the exact location in the TOK BOR mobile application.

NABIHON OTA OSHXONASI на перевале Камчик.

From the first days of its formation, our company has set itself the ambitious task of making the Kamchik crossing comfortable and safe for all electric vehicles. For more than a year we have been looking for a place to realize our idea. A suitable location had to be at the optimal distance and height and have a developed infrastructure so that electric car owners could rest and eat while recharging.

Today we installed an 80 kW fast charging station for Chinese and European electric vehicles at NABIHON OTA OSHXONASI on the Kamchik Pass.

Новая зарядная станция на 80 кВт, установленная на паркинге ГИДРОМЕТЦЕНТРА

With the support of the Center for Hydrometeorological Service of the Republic of Uzbekistan (UZHYDROMET), we develop "green" technologies and take care of preserving our ecology.

The new 80 kW charging station installed in the HYDROMETCENTER parking lot is equipped with two high-speed connectors (GB / T and CCS) for Chinese and European electric cars to make the life of electric vehicles even more comfortable.

Установлена на паркинге сети кафе быстрого питания FEED UP

TOK BOR Triple AC Station, equipped with three Type 1, Type 2 and GBT AC connectors capable of charging any electric car in the world, be it American, European or Chinese!

Installed in the parking lot of the FEED UP fast food cafe chain in Sergeli district  (Mirza Tursunzade Street).

Meet the first fast charging station from TOK BOR in Yunusabad district

Meet the first fast charging station from TOK BOR in Yunusabad district!

The new 80 kW terminal installed in the parking lot of the “Besh Qozon” Plov Center has 2 high-speed connectors: CCS Combo 2 for European and GB/T for Chinese electric cars.

If you want to order a fast charging station for your location, call right now at 78 777 7787, and we will be happy to help you!

TOK BOR: fast charging of electric cars in the most convenient locations in Tashkent!

In the parking lot of the FEED UP cafe chain near the city hospital #1, an alternating current station TOK BOR was launched on Kukcha.

In the parking lot of the FEED UP cafe chain near the city hospital #1, an alternating current station TOK BOR was launched on Kukcha.

The terminal is equipped with one GB/T AC connector for Chinese electric cars.

You can check if the charging station is free in the TOK BOR mobile application.

Enjoy the quality charging!

Another fast 120 kW DC-station from TOK BOR started working at the ECOBOZOR parking lot in BERUNI

Another fast 120 kW DC-station from TOK BOR started working at the ECOBOZOR parking lot in BERUNI.

It is equipped with two DC connectors for Chinese electric cars, distributing the station's guaranteed power to 40 and 80 kW.

Thus, charging takes from 15 minutes to 50 minutes - depending on the model of the electric vehicle and the level of remaining charge.

Happy and fast charging to all!

We installed another station on the parking of the Ankhor Lokomotiv park!

We installed another station on the parking of the Ankhor Lokomotiv park!

This time fast- at 160 kW

At the new station, 2 Chinese electric cars with a connector (GB / T) can be charged at the same time, receiving a guaranteed power of 100 or 60 kW!

Charge not just FAST, but also with PLEASURE!

Is there enough charge for the return trip?

Is there enough charge for the return trip? This question is asked by every electric car driver before a trip to the mountains.
By installing a fast electric vehicle charging station TOK BOR on the BOCHKA, this issue is removed overnight!

Excellent location: mountain complex "Chinorkent" with a cable car and two restaurants
Power per 60 kW
Connectors for Chinese and European models

TOK BOR: with care for your comfort and quality of rest.

Now rest in Chimgan is not a headache for electric drivers, but a pleasant tradition!

Now rest in Chimgan is not a headache for electric drivers, but a pleasant tradition!

In the parking lot of the mountain resort LAYNER, whose representatives have taken care of their guests, there is a new public charging station equipped with two sockets for Chinese and European electric vehicles with a charging power of 60 kW.

Enjoy your car charging and have a great rest in the best resort complexes of Chimgan!