Two more TOK BOR stations of 120 kW each are installed in the parking

Two more TOK BOR stations of 120 kW each are installed in the parking

Two more TOK BOR stations of 120 kW each are installed in the parking lot at the back side of Ecobozor Beruniy. Now, tgere is no need to wait in line at your favorite location, while saving your time! Waiting for you! Charge with pleasure using the TOK BOR network

<< Back